1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
goldenfox [79]
3 years ago
7

What decides the amount of delay between shots on a digital camera?

Computers and Technology
1 answer:
Ad libitum [116K]3 years ago
8 0

Answer:

Some cameras have something called “shutter lag” which is the time it takes from the instant the shutter is pressed, until the instant the picture is taken. This can be very disruptive to the photographer, and although it is not possible to eliminate this delay, it is possible to minimize it a lot.

Explanation:

One of the main causes of shutter lag in dSLR cameras is the mirror that allows you to preview the image, since it needs to be raised in order for the light to reach the sensor. This time is minimal, however, and varies from camera to camera.

The focus delay exists in professional cameras as well and needs to be avoided in the same way, but the time it takes for the lens to clear the image, in these cases, is slightly less. Another factor that contributes to the photographer is the use of manual focus, completely eliminating this type of shutter lag.

Another type of delay that occurs is the image processing time by the sensor. This is not really a shutter lag, since it occurs after the photo was taken, but it can hinder the capture of sequential photos, as many cameras spend several seconds processing the same image.

You might be interested in
Complete the below function which dynamically allocates space to a 3d array of doubles, initializes all values to 0, and returns
MAVERICK [17]

Answer:

Explanation:

1. double ***alloc3dArrayOfInts( int length, int width, int depth) {

2. double ***array3d = malloc(length * sizeof(double **) );

3. for(int i=0; i< length ;i++) {

4. array3d[i] = malloc(width * sizeof(double *) );

5. for(int j=0; j< width;j++) {

6. array3d[i][j] = malloc(depth * sizeof(double) );

7. }

8. }

9. return array3d;

10. }

5 0
3 years ago
1.What is a project methodology?
blagie [28]

Explanation:

1. Let’s suppose that we want to test a scientific hypothesis. What we need to do first is to come up with steps and techniques for testing this hypothesis. This, in a similar way explains what project methodologies are. A project methodology gives us a properly organized way of planning and executing a substantial amount of work that needs to be completed in a given amount of time. Think of it as a game plan that you need to up with to develop a product or an IS.

2. Following a particular methodology comes with its own advantages.

  1. 1. It gets you focused on the product you are trying to come up with.
  2. 2. So many lessons will be learnt and will be documented as experiences and will be integrated as best practice. In the event that the project is a success, the same methodology can be used once again in the future.
  3. 3. Saves time since the same prescription of tools, phases, and techniques used for a particular project can be reused once more to come up with another project.

3. It maps out the existence of a project from start to finish. It is defined within a given methodology. Projects, like humans, have defined life-cycles. The same way we come out of wombs, grow, mature, decline, and then die is the same way a project has a beginning, mid, and end.

4. It does not matter whether a project one is working on is huge or not, they have to be organized into a sequence of phases for manageability. These phases include phase exits, stage gates, and kill points. Having these phases aligned together will give an organization a clear indication of how to evaluate the project’s performance and be able to mitigate problems that arise.

5. Starting the next phase just before the current one ends can sometimes be a good thing since it can reduce the schedule of the project. This is what is known as fast tracking. It is a good idea but introducing one phase before another one ends can cause an overlap and as a result can pose as a risk. Do it if the risks are within scope and can be accepted.

6. An idea that someone comes up with to build a new information system or product can be counted as one of the initiation processes of a PLC.  However, the first process is to define the goal of the project. Organizations have put amounts of time and investments into coming up with a project. Therefore, every little aspect of the project should be properly envisioned to meet the business's value. This is phase where we should ask ourselves questions like whether the project is going to be successful and how we will identify its success in correlation to the investments raised by the stakeholders. It is the phase upon which every detail is looked into carefully and goals defined before the project is flagged off.  

7. This phase provides the direction and planning for the project. Once the project has been flagged off and is ready to move forward, the team needs to define what the objectives will be, when and what time the project will be completed, and the amount of money that will be required to finish. In addition, things like how many people are we looking at to complete the project and the technology that will be used to build the project are highly considered and looked into in this phase.

8. At this point, the project must be approved first before moving on to this phase. The teams put all efforts of design, development, and delivery of the final product. Whoever has invested on the product will now start to have a clear picture of everything that is going on from the first phase of planning to the actual implementation based on time it has taken to the budget that has been so far.

9. Every beginning must always have an end and this is the phase that ensures a well-defined end. It ensures that the amount of effort and work that the teams have put in developing and implementing the product is complete. This phase also sees the team and stakeholders have meetings to try and consolidate and come into terms of whether or not the goals of the planning phase have been achieved.

10. Because every single project has its own goals and achievements that it wants to meet. Every product is unique in terms of what it wants to achieve and the principles and practices might not work for every project. It is the processes used to come up with the particular project that will play an integral part in the life cycle

Learn more about project methodologies by clicking on the link below

brainly.com/question/13821095

brainly.com/question/988326

#LearnWithBrainly

4 0
3 years ago
Careers on the largest declining industries list will see an increase in the number of employees in their workforce.
IrinaK [193]

The answer is False.

The word "declining" means going down. So, in this case, the employees would go down or leave.

7 0
3 years ago
​When converting plain text to hexadecimal for use with ProDiscover, you need to place ____________ between each character's hex
mina [271]

Answer:

Null(00) is the correct answer to the following blank.

Explanation:

Because when we changing the plain text into the hexadecimal then, we have to place null(00) to use with pro-discover in the middle of each and every hexadecimal value. We use null(00) because the null value contains 0(zero) or having no value.

So, that's why the following answer i.e., null(00) is true.

3 0
4 years ago
Jayden wants to take a current theme but just change a little bit of it. Complete the steps to help Jayden.
Georgia [21]

Answer:

Go to the  

✔ Page Layout

tab on the ribbon and the  

✔ Themes

group.

Click Themes and select one.

Go into the workbook, make the changes, and return to the Themes gallery.

Select  

✔ Save Current Theme

to save the changes.

Explanation:

yup

4 0
3 years ago
Other questions:
  • Mauricio plans on retiring in 20 years, and he wants to double his money by that time. He has contacted various banks, looking f
    10·1 answer
  • Write a program to read-in a sequence of integers from the keyboard using scanf(). Your program will determine (a) the largest i
    8·1 answer
  • The rules that determine what is allowed in a program are known as the
    14·1 answer
  • ITS MAKING ME TYPE URL CODES NOW!
    6·1 answer
  • Worth 30 pts
    9·2 answers
  • Habilidades de la alfabetizacion digital?
    12·1 answer
  • Which of the following types of networks encrypts data for transmitting over
    15·1 answer
  • Match each item with a statement below. - A popular port scanners that has the ability to use a GUI front end - Allows you to pi
    8·1 answer
  • What are the similarities characteristics between computer and human beings?​
    13·2 answers
  • How do you delete your brainly account
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!