Answer:
A) Profitability index.
Explanation:
Based on the scenario being it can be said that the most appropriate tool to use in this specific situation would be a Profitability index. This is a ratio that weighs the payoff to the investment of a specific project. It is allows individuals to rank projects on the amount of value that they will be getting from them. Thus allowing you to choose the most optimal projects in situations such as this one.
Requirements managers are responsible for documenting and analyzing and prioritizing requirements for projects and ensuring the products or services conform to the agreed upon capabiities of these. For example, in a mine a drill contractor may be required to drill a hole of only a certain diameter and complete holes say up to 300m long and have a drill that fits inside a safety canopy provided by the client.
Answer:
"Legs"
Explanation:
When a campaign is said to have legs it means that it has staying power.
Having legs means a concepts ability to remain flexible and grow while maintaining an entitie's brand and identity.
Such campaigns work in whatever medium you decide to use. For example digital media, radio and television.
It should be a concept that is replicable over the life of the campaign
Answer:
The correct answer is:
$4 (D.)
Explanation:
From the question, we are told that:
the price of halvah (MUH)= $12
the price of pomegranates (MUP)= ????
Next, we are also told that the optimal consumption ratio of MUH to MUP = 3
This means that the Mauginal Utility of halvah (H) to the marginal utility of pomegranates (P) = 3
MUH/MUP = 3
12/MUP = 3
MUP = 
MUP = $4
Answer:
A) $2.50 per direct labor-hour
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)
where,
Estimated manufacturing overhead = Rent on factory building + Depreciation on factory equipment + Indirect labor + Production Supervisor's salary
= $15,000 + $8,000 + $12,000 + $15,000
= $50,000
And, the estimated direct labor hours is 20,000
So, the rate is
= $50,000 ÷ 20,000
= $2.5 per direct labor-hour