Answer:
It's arithmetic
Step-by-step explanation:
For n=0 you got 4
For n=1 you got 4-1/6
For the next element the value will be the current element minus 1/6
Ok so u have to multiply for this one
Work *Jake*:
So he spends 2 hours on each assignment. He has 3 assignments so u have to do :
2*3=6
He spend 6 hours a day doing home work so now u have to multiply that by 30:
6*30=180
Work *Orlando*:
So he spends 2 hours on each homework. He has 2 sheets each do so u have to multiply 2 and 2:
2*2=4
He spends 4 hours a day doing homwork so u have to multiply it by 30:
4*30=120
Answer:
So Jake spends 130 hours
Orlando spends 120 hours
Add both together:
120+130=250
They spend 250 hours together on work in 30 days/
The residual value will be equal to -1.
<h3>What is residual value?</h3>
A residual is a difference between the observed y-value of a data point and the predicted y-value on a regression line for the x-coordinate of the data point. A residual is positive when the point is above the line, negative when it is below the line, and zero when the observed y-value equals the predicted y-value.
Take, for instance, we have the following data entry:
Observed value = 69.4
Predicted value = 70.4
The residual (r) would be:
Residual value = 69.4 - 70.4 = -1
Therefore the residual value will be -1
Read more about residuals at:
brainly.com/question/7467603
#SPJ1
Answer:
Base Fee = $7
Extra charges = $7
Step-by-step explanation:
Represent the base charge with x and the additiional charges with y.
For the 5 hours job, we have:

For the 3 hour job

Solving for x and y;


Subtract the second equation from the first


Solve for y


Substitute 7 for y n the first equation





A. a^1/12
When dividing two exponents with the same base, subtract the denominator exponent from the numerator's exponent.
the difference is the value of the new exponent with the same base.