Answer:
0.8413 is the required probability.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 4.00 centimeters
Standard Deviation, σ = 0.60 centimeters
Sample size, n = 16
We are given that the distribution of average diameter is a bell shaped distribution that is a normal distribution.
Formula:
Standard error due to sampling =

P(diameter of sample is more than 3.85 centimeter)
P(x > 3.85)
Calculation the value from standard normal z table, we have,
0.8413 is the probability that the the average diameter of sample of 16 sand dollars is more than 3.85 centimeters.
Answer:
20000+600+7
Step-by-step explanation:
7
a trapezoid
equation for area = h(a +b) ÷ 2
so you sub that in
8(9 +21) ÷ 2 = 8 × 30 ÷ 2 = 120
so the area is 120cm
8
A trapezoid
equation for area = h(a +b) ÷ 2
so you sub that in
6(9 + 5 ) ÷ 2 = 6 × 14 ÷ 2 = 42
So the answer is 42 inches
9
A kite
equation for area = p× q ÷ 2
so you sub that in
(3+3)×(4.5+6.5) ÷ 2 = 6×11÷2 = 3
So the answer is 33 cm
sorry I can't see 10s measurements
Step-by-step explanation:
20+8+5=33
33×3=99
hope it helps broo
Answer:
75 minutes
Step-by-step explanation:
First cook 40 and 45 min dishes on separate burners. Then after 40 min put 35 min dish to be cooked on that burner. This will take 75 minutes time.
On second burner put firstly 15 min and then 10 min dish or vice versa as it doesn't matter. This second burner will take 70 minutes which is less then first one.