(10,000,000)(2,000,000)(400,000)(30,000)
i think could it be 12.5?
Answer:
1/8 and 12.5%
Step-by-step explanation:
Answer:
The lines that could be the image of line m after a dilation are;
C. n
E. p
Step-by-step explanation:
A dilation is the operation performed on a geometric figure, that involves the uniform enlargement or uniform shrinking of the figure from a given center of dilation, such that the shape of the figure, which can be a line segment, a polygon, or a point on the coordinate plane
From the given options, the lines l and consists of rotation of the line m and are therefore not purely dilations of the line m
9514 1404 393
Answer:
c. $20.23
Step-by-step explanation:
The overhead cost per labor hour is found by dividing overhead costs by labor hours:
$163,900/(8100 h) = $20.23 /h
The factory overhead rate is $20.23 per labor hour.