Answer:
Sneakerheadz produced 900 pairs on Sunday. And on Monday, they produced shoes at a rate of 300 per hour.
Then the total number of pairs produced is:
S(t) = 900 + 300*t
where t represents the number of hours worked on Monday.
We know that Nuckicks only worked on Monday, and the same amount of time as Sneakerheadz, but at a rate of 480 sneakers per hour.
We can write the total number of pairs as:
N(t) = 480*t
Now we know that Nukcicks produced in Monday the sane number of pairs than Sneakerheadz produced in the two days, then we have that:
S(t) = N(t)
900 + 300*t = 480*t
900 = 480*t - 300*t = 180*t
900/180 = t
5 = t
So the factories operated 5 hours on Monday.
Answer:
[see below]
Step-by-step explanation:
Using the Pythagorean Theorem:

Hope this helps.
Answer:
4 lol
Step-by-step explanation:
Answer:
(1)
The point estimate of the population mean is
we need to find first the degrees of freedom, given by:
Step-by-step explanation:
Previous concepts
A confidence interval is "a range of values that’s likely to include a population value with a certain degree of confidence. It is often expressed a % whereby a population means lies between an upper and lower interval".
The margin of error is the range of values below and above the sample statistic in a confidence interval.
Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".
represent the sample mean
population mean (variable of interest)
s=240 represent the sample standard deviation
n=64 represent the sample size
Solution to the problem
The confidence interval for the mean is given by the following formula:
(1)
The point estimate of the population mean is
we need to find first the degrees of freedom, given by:
It is not specified how much she was saving before...
If 0 than it is D 70/543