Answer:
72 kg
Step-by-step explanation:
For concreatting a tower cement, sand, stones are in the ratio 1:2:4 For 144kg sand.. What amount of cement is required?
We are given the ratio
cement: sand:stones
= 1:2:4
The sum of proportion =
1 + 2 + 4 = 7
We are given the kg of sand = 144kg
Step 1
We find the total kg of cement, sand and stones = x
Using the proportion of sand,
2/7 of x = 144kg
2/7 × x = 144kg
2x/7 = 144kg
Cross Multiply
2x = 7 × 144kg
x = 7 × 144kg/2
x = 504kg
Therefore the total kg of cement, sand and stone = 504kg
Step 2
The amount of cement required is calculated as:
1/7 × 504 kg = 72 kg
Therefore, 72kg of cement is required.
Hey there! :)
This figure is an irregular polygon. Regular polygons have side lengths that measure the same length. In this polygon, not all the sides are equal. Therefore, it is an irregular polygon.
Your answer is the 2nd choice ⇒ irregular polygon
Hope this helps :)
Answer: 
Step-by-step explanation:
Given
Raju buy an old car for 
He spent
on its repair
The selling price of the car 
So, the cost price is

Here, 
Gain percent is

Answer:
b = 17.318 height = 23.318 ft
Step-by-step explanation:
This IS very similar to the other one, Emily..... Have you tried to solve it the same way?
b = 152 tan 6.5 = 17.318 ft (using a calculator)
add the height of the victim's head (6 ft)
17.318 + 6 = 23.318 ft