Answer:
B. (-r, 0)
Step-by-step explanation:
W is on the x axis, so the y coordinate is 0.
It is also r away from the origin, so the x coordinate is -r
Hope this helps!
Answer:13( n + 5) = 91
Step-by-step explanation: solve the parenthesis first and then multiply that by 13
f(-1) = -11 and f(3) = -3 . these functions are true .
What does a math function mean?
- A relationship between a group of inputs and one output each is referred to as a function.
- A function is an association between inputs in which each input is connected to precisely one output.
- A domain, codomain, or range exists for every function. f(x), where x is the input, is a common way to refer to a function.
- In mathematics, a function is an expression, rule, or law that establishes the relationship between two variables (the dependent variable).
given function f(x) = 2x - 9
f(-1) = -11 ⇒ x = -1 put in function
f( -1 ) = 2 * -1 - 9 ⇒ - 11
f(2) = 5 ⇒ x = 2 put in function
f( 2 ) = 2 * 5 - 9 = 1
f(3) = -3 ⇒ x = 3 put in function
f ( 3 ) = 2 * 3 - 9 = -3
f(-3) = 15 ⇒ x = -3 put in function
f( -3) = 2 * -3 - 9 = - 15
Learn more about function
brainly.com/question/21145944
#SPJ13
Answer:
95.64% probability that pledges are received within 40 days
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that pledges are received within 40 days
This is the pvalue of Z when X = 40. So



has a pvalue of 0.9564
95.64% probability that pledges are received within 40 days