Answer:
Cost, C = $28410.72
Step-by-step explanation:
We have, a concrete pillar has the shape of a cylinder.
Diameter of pillar is 8 m and ts height is 9 m
If concrete costs $87 per cubic meter, it is required to find the concrete cost for the pillar. For this lets find the area of cylindrical shape. So,

The cost of pillar at the rate of $87 per cubic meter will be :

B because its in the hundredths place
Complete the equation of the line through (-10,-7)(−10,−7)(, minus, 10, comma, minus, 7, )and (-5,-9)(−5,−9)(, minus, 5, comma,
Tanzania [10]
Answer:

Step-by-step explanation:
First, the slope is determined by using the following expression:



The y-intercept is found by using the line equation, the slope and one point:




The equation of the line is:

Answer: its not showing the
Step-by-step explanation:
83-63=20
So your answer is 20