Answer:
0.0075 N·m
Step-by-step explanation:
Work is the product of force and distance:
W = fd
W = (0.3 N)(0.025 m) = 0.0075 N·m
__
<em>Additional comment</em>
1 N·m = 1 J
Use the units you like. You could also write this in terms of millijoules: 7.5 mJ.
0.71428571 is what I got. i'm so sorry if it's wrong!
Normally we use wats called the principal squar root or the positive squar root more oftern then the negative root
techniclly
=-16 and +16
so the answer is no
Answer:
(2, -1, 1)
Step-by-step explanation:
Solve for the first variable in one of the equations, then substitute the result into the other equation.
UV is a <u>perpendicular</u> <u>bisector</u> of RT. A perpendicular bisector UV is a line that does two things:
- cuts the line segment RT into two equal pieces or bisects it;
- makes a right angle with the line segment RT (is perpendicular).
Consider an arbitrary point X on the line RT that differs from S. Connect points U, V and X to form triangle UVX. Line XS will be the height and the median of the triangle UVX. This gives you that triangle UVX will be isosceles triangle with base UV.
Answer: correct choice is D