Answer:
And replacing we got:
So we are going to expect about 2,85 automobiles for this case.
Step-by-step explanation:
For this case we define the random variable X as "number of automobiles lined up at a Lakeside Olds dealer at opening time (7:30 a.m.)" and we know the distribution for X is given by:
X 1 2 3 4
P(X) 0.05 0.30 0.40 0.25
The expected value of a random variable X is the n-th moment about zero of a probability density function f(x) if X is continuous, or the weighted average for a discrete probability distribution, if X is discrete
For this case we can calculate the epected value with this formula:
And replacing we got:
So we are going to expect about 2,85 automobiles for this case.
<span>5.8+4.1-12.6+x-8.9=-4.6
We move all terms to the left:
5.8+4.1-12.6+x-8.9-(-4.6)=0
We add all the numbers together, and all the variables
x-7=0
We move all terms containing x to the left, all other terms to the right
x=7</span>
The bus ride takes 25, and the bike ride takes 15, so 25+15=40. the 05 from 3:05 plus the 40 minutes it took him to get to soccer practice, locas arrives at 3:45
Answer:
Step-by-step explanation:
Use the formula to find the z-score, then go to the table that will give you the probability that the value is less than this z-score.
The probability that the value lies to the left of 1 on a standard bell curve is 84.1345%, or 84%, the third choice down.
Answer:
y = 1/2x
Step-by-step explanation:
Perpendicular slope is opposite and reciprocal