Answer:
The coordinates of C is (-8,1)
Step-by-step explanation:
Looking at the attached image, you'd see that, AB is 1 and BC is 1, that's because we are told that ratio of AB to AC is 1:2 meaning, AC is 2 and AB is 1. Therefore for that ratio to be satisfied BC has to be 1 so that AC would be 2.
Now let's assume the coordinates of C is
.
To get it's coordinates, we use the section formula:

Where (m,n) is the (AB, BC)
Therefore we have

This gives:

and 
From there x = -8 and y = 1
Therefore the coordinates of C is (-8, 1).
Using confidence interval concepts, it is found that:
a) The point estimate is the sample mean.
b) The confidence interval is: 
c) If $1411 is between the bounds of the interval yes, otherwise no.
--------------
- At item a, it asks to provide a point estimate for the population mean, which is the sample mean

--------------
Item b:
- In the spreadsheet, it is possible to find the <em>standard deviation for the sample</em>, thus, the t-distribution is used.
- The confidence interval will be given by:

In which:
is the sample mean.- T is the critical value, from the t-distribution, with a two-tailed area of
and n-1 degrees of freedom. - s is the standard deviation for the sample.
- n is the sample size.
--------------
Item c:
We have to check if 1411 is between
and
.
- If it is, the interval includes the National Average, otherwise, it does not.
A similar problem is given at brainly.com/question/24232455
7/8 Because there are (7 marbles that are not 8 / 8 possibilities).
About $801.99 bc 603X.33 is 198.99 plus 603 is 801.99
Answer: 8.5%
7/82=0.0853
Multiply by 100 to get percentage
0.0853 x 100 = 8.53