Answer:
$ 800
Step-by-step explanation:
Parking slot is in the shape of parallelogram.
base = 3 m
Height = 6 2/3 m
Area = base * height

Cost of paving the parking spot = 20 * 40
= $ 800
Since these both are on the same hour we'll ignore the 5. We end up having :35 and :52. We'll subtract 35 from 52 which gives us 17. The answer to this is 17 minutes.
Answer:
g(x) = (x + 2)^2 + 1
Step-by-step explanation:
From the graph/image that you have provided said translated shift of
f(x) -> g(x)
f(x) = x^2 , g(x) = a(x -h)^2 +k
h is shift right/left
k is shift up/down.
It appears that the shift is left 2 and up 1.
h = -2 and k = 1
g(x) = (x - (-2))^2 +1
g(x) = (x + 2)^2 + 1
Answer:
$440,000
Step-by-step explanation:
Direct material:
= $195,000 - $30,000
= $165,000
Direct labor:
= $150,000 - $40,000
= $110,000
Manufacturing overhead:
150% of direct labor cost.
= $110,000 x 150 ÷ 100
= $16,500,000 ÷ 100
= $165,000
Total manufacturing costs:
= $165,000 + $110,000 + $165,000
= $275,000 + $165,000
= $440,000
The total manufacturing costs added during the period is: <u>$440,000</u>