Answer:
292 inches^2
Step-by-step explanation:
So to start off this is a picture of the fish tank.
Next we will find the area of the bottom and top rectangles.
The side lenghts for those two is 7 and 8.
So the area of one is 56 and the area of 2 is 112 inches^2.
Now we will find the area of the left and right rectangles.
The side lenghts are 6 and 8.
So the area of 2 is 96 inches^2.
Now for the front and back rectangles.
The side lenghts for those two are 6 and 7.
So the area of both is 84 inches^2.
So after adding all the areas up the surface area is 292 inches^2.
Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.
(128 oz) * (2 oranges)/(5 oz) * (1 bag)/(11.5 oranges) * $3.49/bag ≈ $15.54
Note that we have assumed 11.5 oranges per bag, and that partial bags are available.
If Chantal must buy whole bags of oranges, 5 bags will be needed and the cost will be $17.45.
Answer:
y = 2.50x + 10
Step-by-step explanation:
I’m not an expert at this but my guess is 45 degrees. Can you let me know what the correct answer was?