This is Transitive Property.
Blame me if you get it wrong :\
Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.
Sqrt7 / sqrt 11 = sqrt7/11
4x-8 = 31
4x = 31 + 8
4x = 39
x = 9.75
1. -7×3t−7×−9
2. -21t−7×−9
3. -21t−(−63)
Answer:
-21t + 63