16.36 times 9 which equals to 147.51 minutes
Total height of lumber, H = 10 1/2 feet = 21/2 feet .
Height of side panel, h = 5 2/3 feet = 17/3 feet .
Now,
Extra lumber required, L = 2 × Height of side panel - Total height of lumber
![L=[2\times (\dfrac{17}{3})]-\dfrac{21}{2}\\\\L = \dfrac{5}{6}\ feet](https://tex.z-dn.net/?f=L%3D%5B2%5Ctimes%20%28%5Cdfrac%7B17%7D%7B3%7D%29%5D-%5Cdfrac%7B21%7D%7B2%7D%5C%5C%5C%5CL%20%3D%20%5Cdfrac%7B5%7D%7B6%7D%5C%20feet)
Therefore, extra lumber required is
feet.
Hence, this is the required solution.
Add the two, to get it to the other side. Leaving s by itself and it would end up being. 4 >s. With the line under >
here's the solution,
- n = 11
- a = 5 ( a = first term )
- d = 6 ( d = common difference )
we know,
=》

=》

=》

=》

=》

nth term ( 11th term ) = 65