1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Pani-rosa [81]
3 years ago
7

What is the point estimate for the number of cars sold per week for a sample consisting of the following weeks: 1, 3, 5, 7, 10,

13, 14, 17, 19, 21?
A.
4.8
B.
5.22
C.
6.38
D.
6.1
Mathematics
1 answer:
Kamila [148]3 years ago
4 0

Answer: A.

Step-by-step explanation:

Hope this helps!

You might be interested in
A point's coordinates are changed from (–7, –2) to (–7, 2). What effect does this have on the location of the point?It is reflec
NeX [460]
The point is reflected across the x axis. hope this helps you :)
8 0
3 years ago
What is 1/3 of 18? Plz help I don't know.
Aleksandr-060686 [28]
The answer to ur question is 6
4 0
3 years ago
Read 2 more answers
What is nine more than a number y, if that number is 4?
IceJOKER [234]

Answer:

13

Step-by-step explanation:

if y = 4, then 4 + 9 = 13

5 0
3 years ago
Read 2 more answers
X-2=3(x-4) what is the solution
Vladimir [108]
First distribute 3 to (x-4). that gives you 3x-12. Now your equation is x-2=3x-12. Now you subtract x from 3x. now you're equation is -2=2x-12. then add 12 to the left. You're final answer is 10.
8 0
3 years ago
Read 2 more answers
Use a 95​% prediction interval to predict the useful life of a brand A cutting tool when the cutting speed is 45 meters per minu
qwelly [4]

Answer:

<em>The answer resides in the explanation.</em>

<em>Pls rate as brainliest </em>

Step-by-step explanation:

The predicted useful life of a brand A cutting tool when the speed is 45 meters per minute is 1.2 to 5.5 hours.

The predicted useful life of a brand B cutting tool when the speed is 45 meters per minute is 3.4 to 5.4 hours.

The prediction interval for brand A is larger than the prediction interval for brand B because the estimated standard error of  y^ is different for the two intervals.

The prediction intervals are both larger than the corresponding confidence intervals.

The standard error for the estimated mean value of y is smaller than the standard error for the predicted value of y.

The predicted useful life of a brand A cutting tool that is operated at 100  meters per minute is -0.59 hours

The actual predicted useful life of a brand A cutting tool when the speed is 100 meters per minute is 0.0 to 2.3 hours.

6 0
3 years ago
Other questions:
  • Thirteen poker chips are numbered consecutively 1 through 10, with three of them labeled with a 5 and placed in a jar. A chip is
    13·2 answers
  • Point Z is the incenter of triangle RST. What is the value of x? x = 2 x = 3 x = 5 x = 8
    11·2 answers
  • Rhonda is downloading a file from the Internet. The size of the file is 7.45 MB. The file is downloading at the rate of 0.095 MB
    7·1 answer
  • 24% as a fraction simplifying it as far as posible
    6·2 answers
  • Q2.<br>a) Is the equality √a^4 = a valid for all values of a? Explain.<br>​
    10·1 answer
  • Rite the phrase as an expression. Then evaluate when y=20. 3 less than the quotient of a number y and 4 Expression: When y=20, t
    7·2 answers
  • PLEASE ANSWER THIS, QUICK
    13·2 answers
  • What common denominator can you use to add these mixed numbers? -8 3/8 + 6 1/4
    11·2 answers
  • Consider the arithmetic sequence: 6, 2, -2, -6, \dots6,2,−2,−6,…6, comma, 2, comma, minus, 2, comma, minus, 6, comma, dots If nn
    5·2 answers
  • The price of 4 dresses is $486 What is the rate of each dress?
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!