Answer:
a. The percentage of vehicles who pass through this construction zone who are exceeding the posted speed limit =90.82%
b. Percentage of vehicles travel through this construction zone with speeds between 50 mph and 55 mph= 2.28%
Step-by-step explanation:
We have to find
a) P(X>40)= 1- P(x=40)
Using the z statistic
Here
x= 40 mph
u= 44mph
σ= 3 mph
z=(40-44)/3=-1.33
From the z-table -1.67 = 0.9082
a) P(X>40)=
Probability exceeding the speed limit = 0.9082 = 90.82%
b) P(50<X<55)
Now
z1 = (50-44)/3 = 2
z2 = (55-44)/3= 3.67
Area for z>3.59 is almost equal to 1
From the z- table we get
P(55 < X < 60) = P((50-44)/3 < z < (55-44)/3)
= P(2 < z < 3.67)
= P(z<3.67) - P(z<2)
= 1 - 0.9772
= 0.0228
or 2.28%
Answer:
Step-by-step explanation:
Answer:
y x (2x +y) x (7x +y)
Step-by-step explanation:
14x^2y + 9xy^2 +y^3
(Factor the expression)
y x (14x^2 +9xy +y^2)
(Rewrite the expression)
y x (14x^2 + 7xy +2xy +y^2)
(Factor the expression)
y x (7x x(2x +y) + y x (2x +y) )
(Factor the expression)
y x (2x +y) x (7x +y)
:))
Answer:
X + Y + Z = 32
X2 = Y
X3 + 2 = Z
X + X2 + X3 + 2 = 32
Make X alone
There is a 2 so we subtract 2 from both sides
X + X2 + X3 = 30
Add the X's up
X + X2 + X3 = X6
X6 = 30
Divide by 6
30 / 6 = 5
You are left with X=5
The first piece of wood has a length of 5
5 x 2 = 10
The second piece has a value of 10
5 x 3 + 2 = 17
The third piece is 17
Hope this helps. If you have any questions you may ask.
Step-by-step explanation: