1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
erik [133]
3 years ago
13

I need help Find the product. 45 × 40

Mathematics
2 answers:
Crazy boy [7]3 years ago
6 0
It’s is 1800

Hope this helps

Have a great day/night
blsea [12.9K]3 years ago
5 0
I also got 1,800 hope this helps :) sorry that I’m late
You might be interested in
in 2010 an enormous sinkhole suddenly appeared in the middle of a guatemalan neighborhood and swallowed a three story building a
Leokris [45]

Answer:

Step-by-step explanation:

Given that :

The enormous sinkhole that appeared in the middle of Guatemalan neighborhood in the year 2010  swallowed a three story building above it and the  sinkhole has an estimated depth of about 100 feet

How much material is needed to fill the sinkhole?

Then , the material needed to fill the sinkhole will be dependent on the volume of the sinkhole.

Determine what information is needed to answer the question.

The information that is needed to answer this question are:

the base area of the sinkhole will be required; &

the height should also be known

if the base area is determined then we can proceed to determine how much material is needed to be calculated.

Do you think your estimate is more likely to be too high or too low

No, the estimate is not likely to be too high or too low rather the estimate of the material required will be almost  equal to the volume of the sinkhole, but that does not implies that it will be exactly the same since the sinkhole is not uniform and regular in shape.

5 0
3 years ago
Divide 254 by 11.8. round your answer to the nearest hundredth.
Olin [163]
The answer is 21.52 so I hope that helped
8 0
3 years ago
Read 2 more answers
a and b can do a piece of work in 12 days, b and c in 15 days and c and a in 20 days. how much time will a alone take to finish
nydimaria [60]
A and b can do a piece of work in 12 days. If a alone have to finish the job among b and c so

A and b=12
A (24 days alone without b)

So if b and c 15 days and c 20 days. If a have to do all I would add 24 and 15 and 20 which would be 59 days
7 0
2 years ago
Write 0.5 as a percentage
maw [93]

Answer:

50%

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
If sin(x) = 0.4, then what is tax (x)?
Ad libitum [116K]

Answer:

0.43

Step-by-step explanation:

x = sin^-1(0.4)

x = 23.57

tan(23.57) = 0.436

3 0
3 years ago
Read 2 more answers
Other questions:
  • Please help me! I need the anwser asap​
    11·1 answer
  • Algebra 2 find the solution of the equation using a method of your choice
    14·1 answer
  • There are two consecutive even numbers such
    5·1 answer
  • an object travels along horizontal straight path at a constant rate. the object travels 1/20 of the length of the pathing 3/4 se
    7·2 answers
  • What is the distance between P(12, 4) and Q(-8, 2)
    9·2 answers
  • I really need help on this one
    13·1 answer
  • 4. Nick drained 2.8 gallons of water from a fish
    10·2 answers
  • PLS ANSWER ASAP
    6·1 answer
  • You pick a card at random, put it back, and then pick another card at random.
    5·2 answers
  • Plssssssssssssss help
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!