we know that Bob can do the whole job in 14 hours, how much of the work has he done in 1 hour only? well since he can do the whole lot in 14 hours in 1 hour he has only done 1/14 th of the job.
we know that James can do it in 18 hours, a bit slower, so in 1 hour he has done only 1/18 th of the job.
let's say it takes both of them working together say "t" hours, so in 1 hour Bob has done (1/14) of the work whilst James has done (1/18) of the work, the whole work being t/t or 1 whole, so for just one hour that'd 1/t done by both Bob and James.

Answer:
(a) 0.05 minutes per calorie burned
(b) Slope = 20
Step-by-step explanation:
(a) If 200 calories are burned in 10 minutes...then what about 1 calorie
; 1/200 × 10 = 0.05 minutes
(b) Slope of the graph...;just take any two points on the graph...which are (10;200) and (20;400)
Slope = (400 - 200) ÷ (20 - 10)
;Slope = 200 ÷ 10
;Slope = 20
Answer:
slope = 
Step-by-step explanation:
Use the slope formula given in the question to solve for the slope. The
is the variable representing the slope. The
and
values are x and y values of one point. The
and
are x and y values of another point.
So, use the x and y values of the points given and substitute them in the correct order into the formula:

Thus, the slope is
.
Answer:
drishyam 2 train to bysan
Step-by-step explanation: