The answer is 385mi. 110mi/2hr = 55mi/1hr=385mi/7hr
Answer:
10/3 hours
Step-by-step explanation:
12x=15x-10
12x-15x=15x-10-15x
-3x=-10
-3x/-3=-10/-3
x=10/3
Answer:

Step-by-step explanation:
We are given the following in the question:
Controller cost = $135
System cost = $2.50 per foot of pipeline
The total cost depends upon the length of Pole.
Let the system requires F feet of pipeline.
Total cost will be given by the equation:

is the required expression for total cost
F: feet of pipeline required
c(F): Total cost of installation
Nty just putting an answer though you know?
Answer:
the answer is any number above 18