You should order them in A B C or 1 2 3 (high, medium, low priority)
Answer:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Explanation:
If overhead is applied using traditional costing based on direct labor hours, the overhead application rate is:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
<u>For example:</u>
Total estimated overhead= $150,000
Allocation base= direct labor hours
Estimated Total number of direct labor hours= 10,000
Predetermined manufacturing overhead rate= 150,000/10,000
Predetermined manufacturing overhead rate= $15 per direct labor hour
The answer is <u>"a. True".</u>
Preemptive multitasking refers to a task in which a PC operating system utilizes a few criteria to choose to what extent to allot to any one errand before giving another assignment a swing to utilize the working framework. The demonstration of taking control of the working framework starting with one errand and giving it then onto the next assignment is called preempting.
A typical basis for preempting is basically slipped by time (this sort of framework is now and again called time sharing or time cutting). In some operating systems, a few applications can be given higher need than different applications, giving the higher need programs control when they are started and maybe longer time slices.
Answer:
The master budget should only be prepared by top management.
Explanation:
A budget is an estimation of the amount of money that a person or business plans to spend on activities within a given period.
Budgeting creates efficiency in spending and reduces waste.
It is an activity that should be carried out by all relevant staff. This is because the staff know where they need to spend money.
It top management independently make a budget, it may not meet some pressing needs of the staff.
I think D
Step by step explanation