Answer: She will need 36 yards of material.
Step-by-step explanation:
16 × 2¹/₄ can be done different ways,
First multiply ¹/₄ times 16. that is the same as dividing 16/4 = 4
Then multiply 2 times 16 2×16 = 32
Add 32 + 4 = 36
Another way is to change 2¹/₄ to an improper fraction and multiply
⁹/₄ × 16
16
<u> ×9</u>
54
<u> +9 </u>
144
144/4 = 36
<u />
10) V=πr² *h= π*10²*12≈3770
11) V=A(base)*h= (3√3/2)*(9²)*10=2104
A(base)=(P*a)/2=(6*9*3√3)/2=9*9*3√3/2
12)V=πr² *h=π*18² *6≈6107
13)V=4*3*12=144
14) h(triangle)=√(5²-3²)=√16=4
A(base)=(3*4)/2=6
V=A(base)* height (prism)=6*2=12
15) V=A(base)*h= (3√3/2)*(6²)*11= 1029
16)V=A(base)*h=2(1+√2)5²*22≈2656
slope = m = 16-10 / 8-5 = 6/3 = 2
y - y1 = m x (x-x1)
y-10 = 2 x (x-5)
y-10 = 2x-10
y = 2x
If Reducing 2 men will bbe enough too finish the work in 10 days
For rate of work use the formualar
rate of work = quantity of work / duration
10 men can do the work at a rate of = 1 / 8
x men can do same work at a rate of = 1 / 10
x * ( 1 / 8 ) = 10 * ( 1 / 10 )
x = 1 * 8 = 8
therefore 8 men can do the work in 10 days
number of men reduced = 10 men - 8 men = 2 men
Hope it helped
Answer:
Step-by-step explanation:
Let the rental is x
<u>The total is, the equation:</u>
Each skate rental is $3