Answer:
<h2> In 8 hours he will set 1200 bricks</h2>
Step-by-step explanation:
In this problem, we are expected to estimate the number of bricks he can set in 8 hours.
let us convert hours to minutes we have
60 min make 1 hour
x min make 8 hours
cross multiply
x= 60*8
x= 480 min
We are assuming the same rate with which he sets 2.5 brick is the same as the rate with which he will set bricks for the 8 hours windows
so if the bricklayer sets
2.5 bricks in 1min
y bricks in 480 min
Cross multiply we have
y=2.5*480
y= 1200 bricks
hence in 8 hours, he will set 1200 bricks
Answer:
Total length of the first swing=64 m
Step-by-step explanation:
The total length of all four swings can be expressed as;
Total length of all 4 swings=Length of first swing+length of second swing+length of third swing+length of fourth swing
where;
Total length of all 4 swings=175 m
Length of first swing=x
Length of second swing=75% of length of first swing=(75/100)×x=0.75 x
Length of third swing=75% of length of second swing
Length of third swing=(75/100)×0.75 x=0.5625 x
Length of fourth swing=75% of length of third swing
Length of fourth swing=(75/100)×0.5625 x=0.421875 x
replacing;
Total length of all 4 swings
175=x+0.75 x+0.5625 x+0.421875 x
2.734375 x=175
x=175/2.734375
x=64
Total length of the first swing=x=64 m
28 represents 100%
22 represents x %
X= 22•100/28=78.57142857%
Answer is A. 125
any numbers ending with 0 or 5 can divide by 5
Answer:
Scatter plot
Step-by-step explanation:
Using a scatter plot will allow the sales manager to show the data collected about the number of customers who enter the store and the dollar volume of sales for each day because the plot will have a dot to represent each day. The analyze of the pattern formed by the dots will show if there is a relation between the variables and what kind of relation is (systematic or causal). She can also add a regression line to find an explanation for the relation between the variables.