Answer:
Step-by-step explanation:
Therefore, the volume of the water in the tank 25 minutes after Baxter begins filling the tank is 255 gallons.
Step-by-step explanation:
Linear Equation; Ax+By=C
A linear equation to model this situation:
8x + 55 = C
Where;
8 is for the rate of gallons.
'X' is the minutes.
55 is the gallons of water the tank already contained.
8(25) + 55 = 255
Where;
8 is for the rate of gallons.
25 is the minutes.
55 is the gallons of water the tank already contained.
Answer:
Step-by-step explanation:
hello :
note :
Use the point-slope formula.
y - y_1 = m(x - x_1) when : x_1= -9 y_1= -3
m= 2 (the slope)
an equation in the point-slope form is : y +3 = 2(x+9)
means : y+3 =2x +18
an equation in slope-intercept id : y=2x+15
The target cost for Model J20 is $2000.
The required cost reduction is $30.
The total saving will be $30.3.
<h3>How to compute the cost?</h3>
The target cost will be:
= Sales price - (100% × Target cost)
= 400 - (100% × Y)
Y + Y = 400
2Y = 400
Y = 400/2 = 200
Target cost = $200
Therefore, the target cost is $200.
The required cost reduction will be:
= $230 - $200
= $30
The required cost reduction is $30.
The three engineering improvements together will be:
Direct labor reduction = 7.5
Additional inspection = 17
Injection molding = 5.8
Total savings = 30.3
The total savings is $30.3.
Learn more about cost on:
brainly.com/question/10705492
#SPJ1
The 3rd selection describes similar figures.
<span>Polygons ABCD and EFGH have the same shape and are sometimes different sizes.</span>
Answer:
360
Step-by-step explanation:
using the definition
n
= 
where n! = n(n - 1)(n - 2)..... × 3 × 2 × 1
then
6
= 
= 
=
← cancel 2(1) on numerator / denominator
= 6 × 5 × 4 × 3
= 360