Answer:
Step-by-step explanation:
3x%2B4y=12 Start with the given equation
4y=12-3x Subtract 3+x from both sides
4y=-3x%2B12 Rearrange the equation
y=%28-3x%2B12%29%2F%284%29 Divide both sides by 4
y=%28-3%2F4%29x%2B%2812%29%2F%284%29 Break up the fraction
y=%28-3%2F4%29x%2B3 Reduce
Looking at y=-%283%2F4%29x%2B3 we can see that the equation is in slope-intercept form y=mx%2Bb where the slope is m=-3%2F4 and the y-intercept is b=3
Since b=3 this tells us that the y-intercept is .Remember the y-intercept is the point where the graph intersects with the y-axis
So we have one point
Now since the slope is comprised of the "rise" over the "run" this means
slope=rise%2Frun
Also, because the slope is -3%2F4, this means:
rise%2Frun=-3%2F4
which shows us that the rise is -3 and the run is 4. This means that to go from point to point, we can go down 3 and over 4
So starting at , go down 3 units
and to the right 4 units to get to the next point
Now draw a line through these points to graph y=-%283%2F4%29x%2B3
So this is the graph of y=-%283%2F4%29x%2B3 through the points and
Answer:
Factory A should be operated 6.11 days
Factory B should be operated 6.88 days
The minimum cost for factory A is $6,110
The minimum cost for factory B is $5,504
Step-by-step explanation:
Factory A
Daily production: 16 3-speed and 20 10-speed bikes
Total daily production = 16+20 = 36 speed bikes
Order: 80 3-speed and 140 10-speed bikes
Total order = 80+140 = 220 speed bikes
Number of days = 220/36 = 6.11 days
Cost per day = $1,000
Minimum cost for 6.11 days = $1000 × 6.11 = $6,110
Factory B
Daily production: 12 3-speed and 20 10-speed bikes
Total daily production = 12+20 = 32 speed bikes
Total order = 220 speed bikes
Number of days = 220/36 = 6.88 days
Cost per day = $800
Cost for 6.88 days = $800 × 6.88 = $5,504
Everyday, make her/him learn 3-4 tables. After 3 days, give him/her a 'prize' for it. If that does not work, try teaching him 1 by 1 and memorize it.