The correct answer is the sum of the variances of all activities on the critical path.
The Program Evaluation and Review Technique (PERT) is a tool used in project management to calculate the duration of a given activity, a set of activities, or even an entire project.
Critical Path Analysis and PERT Charts are powerful tools that help you schedule and manage complex projects.
Answer:
electroencephalogram (EEG)
Explanation:
The Electroencephalogram
This is an instrument use in determining or measuring of the electrical activity of the brain. It measures from the surface of the scalp that enables us to measure the generalized activity of the cerebral cortex. Its strength is determined by the amplitude ot he device. It is is used to help diagnose certain neurological conditions that is seizures of epilepsy and for other research purposes.
EEG as it is called for short simply measures electrical activity generated by the brain. It measures the voltage generated as a result of the current that flow during synaptic excitation of the dendrites of many pyramidal neurons in the cerebral cortex that is found beneath the the skull and comprises of most of the brain's mass.
Air causes The force of the moon pulls on earths waters
Tsunami a water wave almost the size of a tornato
Earth is a round planet made up of layers. The inner core, an outer core, the lower mantle, the upper mantle, and the outer solid crust. The earth is 61 degrees F (16 C). The earth is made up of iron and nickel. In fact, the earth is made up of oxygen (46%), silicon (27.7%), aluminum (8.1%), iron (5%), and calcium (3.6%). Composition of the Earth.
Hope this helps!
IF YOU LIKE MY ANSWER GIVE ME BRAINLIEST!
The difference is mostly in the amount of humidity. Continental climates usually have cool summers and cold winters and don't have high humidity. Central European is like continental climate except it has humidity because of the way air drifts work. They are similar but the temperature is usually higher.