Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Answer:14908007
Step-by-step explanation:just add them both with a calculater
If you were to round it upwards, it would be 12. :)
2). mean: 2.2, median: 7 , mode: 7 , Range: 17
3) mean: 1.75, median:2, Mode:7, Range: 18
4) mean: 3.67, Median: 4, Mode:8, Range: 12
5) Mean:5, Median:5, Mode: 5 and Range: 5
Answer:
the total attendance is:409
Step-by-step explanation:
hopes this helps!