1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
scZoUnD [109]
2 years ago
7

Help me please!! i’m confused!!

Mathematics
1 answer:
lisov135 [29]2 years ago
7 0
The container will be 270 square centimeters.
You might be interested in
Consider the parabola whose equation is y=x^2-4x and the line whose equation is y=2x+b, where b is some unknown constant
Vikki [24]

Answer:

Step-by-step explanation:

Is there a question somewhere in there?

6 0
3 years ago
A software developer wants to know how many new computer games people buy each year. Assume a previous study found the standard
Marrrta [24]

Answer:

The minimum sample size required to ensure that the estimate has an error of at most 0.14 at the 95% level of confidence is n=567.

Step-by-step explanation:

We have to calculate the minimum sample size n needed to have a margin of error below 0.14.

The critical value of z for a 95% confidence interval is z=1.96.

To do that, we use the margin of error formula in function of n:

MOE=\dfrac{z\cdot \sigma}{\sqrt{n}}\\\\\\n=\left(\dfrac{z\cdot \sigma}{MOE}\right)^2=\left(\dfrac{1.96\cdot 1.7}{0.14}\right)^2=(23.8)^2=566.42\approx 567

The minimum sample size to have this margin of error is n = 567.

3 0
2 years ago
According to the scatterplot below, which statement is correct? A graph titled Courses Completed versus Remaining Credits Needed
kondaur [170]

Answer:

Option B.

Step-by-step explanation:

It is given that a graph titled Courses Completed versus Remaining Credits Needed to Graduate has courses completed on the x-axis and Credits need to graduate on the y-axis.

Points plotted are (4, 110), (8, 76), (16, 63), (20, 53), (24, 33).

Since, x-axis represents the courses completed, therefore the input, or independent variable is courses completed.

Since, y-axis represents the Credits need to graduate, therefore the output, or dependent variable is Credits need to graduate.

Therefore, the correct option is B.

6 0
2 years ago
Read 2 more answers
My teacher used 3/4 a foot of tape on my poster. She used half a foot of tape on my friends poster. How much more tape did she u
ella [17]

Answer: 1/4

Step-by-step explanation:

3/4-1/2=1/4

5 0
3 years ago
Help on this question!!!!!!
Lilit [14]

Answer:

13

Step-by-step explanation:

use the Pythagorean theorem; five squared plus twelve squared is equal to the missing side squared, 25+144=169, the sqrt of 169 is 13

8 0
3 years ago
Other questions:
  • the original price of a DVD player was reduced by $45.50. the sale price was $165.90. Solve the following equation to solve the
    15·1 answer
  • Together, teammates Pedro and Ricky got 2691 base hits last season. Pedro had 283 more hits than Ricky. How many hits did each p
    6·2 answers
  • Total pay before deductions is known as
    5·1 answer
  • Solve the equation<br>(5p-8)/2=(7p+4)/6​
    10·1 answer
  • 2. The width of a rectangle is 12 inches less than its length. The perimeter of the rect-
    14·1 answer
  • mr dela cruz uses 18 yards of cloth for making 5 pants how many pants will he make for 72 yards of cloth​
    15·1 answer
  • When the equation 16/x = 4 is simplified, the value of x is??
    9·2 answers
  • 4y + 4 = 2y - 10 <br> can somebody break this down to solve it ? please
    5·1 answer
  • Luca made a scale drawing of the auditorium. in real life, the stage is 45 feet long. it is 18
    14·1 answer
  • Give ur answer in standard form. <br>3 x 10^4 ÷6 x 10^-4<br>​
    15·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!