Answer:
40 days
Step-by-step explanation:
Let x represent the original production time. Then 70x is the order quantity involved.
When the same order quantity is produced at a rate of 80 items per day for x-5 days, we have the equation ...
70x = 80(x -5)
70x = 80x -400
0 = 10x -400 . . . . . subtract 70x
0 = x -40 . . . . . . . . divide by 10
40 = x . . . . . . . . . . add 40
The original schedule was for production to take 40 days.
There are two choices for each child: overweight (o) or underweight (u). So if the first child is o the next can be o or u. If the first is u the second can be o or u. This gives four possibilities. Here the first child is the letter noted first and the second is the one listed second:
OO
OU
UO
UU
There are 4 outcomes and if each is equally likely then the probability of each is 1/4. Thus the probability of UU is 1/4
The probability of one underweight and one over weight is 1/2 because in two of the outcomes listed above there is one O and one U (namely OU and UO). Since there are 4 outcomes the probability is 2/4 = 1/2
Answer:
The answer is C!!
Step-by-step explanation:
Answer:
The volume of the triangular prism: 59.2
The value of the concrete used is: 16*4 = $64
Step-by-step explanation:
I think your question is missed of key information, allow me to add in and hope it will fit the original one. Please have a look at the attached photo
My answer:
As we know that, the formula to find out the volume of the triangular prism is:
V =
when h is the height and a&b are the length of the two square edges. So we have:
- V =
*4*4*7.4 = 59.2
To find the concrete used in the ramp if the cost of concrete is $ 4.00 per cubic foot, we need to know the area of the ramp, which is:
S = 4*4 = 16
Hence, the value of the concrete used is: 16*4 = $64
Answer:
(-1.5,0) (0,1)
Step-by-step explanation:
used desmos