1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Anna71 [15]
2 years ago
9

The ratio of in-state to out-of-state visitors to the amusement park was 4 to 3. If there were 14,000 visitors to the park, how

many were from out of state?
Mathematics
1 answer:
exis [7]2 years ago
8 0

Answer:

<em>6000 people</em>

Step-by-step explanation:

Given the ratio of in-state to out-of-state visitors to the amusement park was 4 to 3, the total ratio will be 4+3 = 7

Total visitors in the park = 14,000 visitors

Number of people that were out of state = 3/7 * 14000

Number of people that were out of state = 3 * 2000

Number of people that were out of state = 6000

<em>Hence there were 6000 people out of state.</em>

You might be interested in
A kite has a height of 36 inches and a width of 30 inches. Explain how to use the area formula for a triangle to find the area o
mote1985 [20]

Height of the kite is = 36 inches.

Width of the kite is = 30 inches

One of the ways to find the area is to draw a vertical line to break the kite into two equal triangles. Mark the base as 36 inches and height as 15 inches .

Now we will use the formula area=\frac{1}{2}*base*height to find the area of each triangle. Then we will add both the areas to find the area of the kite.

Area of 1 triangle = \frac{1}{2}*36*15 = 270 square inches

Area of the 2nd triangle is also = 270 square inches

Hence, area of the kite = 270+270 = 540 square inches

8 0
2 years ago
Read 2 more answers
it takes 8 labours 6days to complete a certain job.how many labours would complete the job in 15 days.​
VashaNatasha [74]

Answer:

Step-by-step explanation:

Required man days to complete the job = 8 * 6

                                                                   = 48 Man Days

Required labors to complete the job by 15 days = 48/15

                                                                               = 3.2

It means, it is required 4 labors can complete the certain work by 15 days

3 0
3 years ago
Please help me with this
xenn [34]

Step-by-step explanation:

based on my understanding of the dreidel, this is a regular spinner with 4 equal sides (but different symbols on them, so, we can clearly distinguish between the possible 4 different outcomes).

in other words, this resembles a die with only 4 sides and therefore only 4 equally probable outcomes.

and therefore, the probability to get the specified symbol in 1 attempt is indeed 1/4.

remember, a probability is always desired cases over totally possible cases.

and here, we have one desired outcome out of 4 possible outcomes. hence the probability of 1/4.

now, we are spinning the dreidel twice.

that means we have now 4×4 = 16 possible outcomes.

but we only want the outcomes, where the specified symbol is showing exactly once - either after the first spin or after the second spin.

so, out of the 16 possible combinations, we want only the ones, where the first spin delivered that result :

1 option on the first spin and 3 options (4 minus the already delivered result) on the second spin : 1×3 = 3.

and the ones, where the second spin delivered the result (but not the first). so, we have 3×1 = 3 options there.

that means we have 6 desired cases out of total 16 possible outcomes, and the probability is

6/16 = 3/8

mathematically we would simply say that the probability is the sum of

the probability of spinning it first combined with the probability of not spinning it second.

the probability of not spinning it first combined with the probability to spin it second.

that is

1/4 × 3/4 = 3/16

+

3/4 × 1/4 = 3/16

-----------------------

6/16 = 3/8

I don't know the options you can select, but I hope you understand the principles I explained. and I gave you the result and the way to calculate it.

so, hopefully you find the fitting options.

8 0
2 years ago
Mean of Beans Eaten per Day
DIA [1.3K]
Def kidney beans idk why
6 0
3 years ago
Read 2 more answers
A trail mix is made by adding pecans that sell for 2.50 per pound to chocolate candies that sell for 1.00 per pound. How much of
Vera_Pavlovna [14]

Answer:

Should be used 28 pounds of pecans and 32 pounds of chocolate candies

Let

x -----> pounds of pecans used

y ----> pounds of chocolate candies used

we know that

-----> equation A

----->  -----> equation B

Solve the system of equations by graphing

Remember that the solution is the intersection point both graphs

Using a graphing tool

The solution is the point (28,32)

see the attached figure

therefore

Should be used 28 pounds of pecans and 32 pounds of chocolate candies

5 0
3 years ago
Other questions:
  • The last Ice age ended about 10,000 years ago write this length of time in scientific notation
    14·1 answer
  • What is the approximate area of the unshaded region under the standard normal curve below? Use the portion of the standard norma
    11·1 answer
  • Miguel score 35 fewer points in second bowling game than his first game his total score for the two games was 395 how many point
    10·1 answer
  • D=7.9cm. what is the circumference and area of the circle?
    11·2 answers
  • 8x -7 =19x +15 <br> Solve equation
    12·1 answer
  • 27-10/30
    7·1 answer
  • the distant between two towns is kilometers there are approximately 8 kilometers in 5 miles which measurement is closest to the
    10·1 answer
  • I need help ASAP please giving brainliest!!
    15·2 answers
  • 1.<br>How many seconds are there in 8<br>minutes 12 seconds?​
    12·2 answers
  • Please please hurry ! What is the length of side X?
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!