1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
natta225 [31]
2 years ago
14

PLEASE HURRY I WILL GIVE BRAILIEST TO WHO EVER ANSWERS AND IS CORRECT

Computers and Technology
2 answers:
Valentin [98]2 years ago
5 0

Answer:

Accessible twenty-four hours per day and seven days per week

Quick and easy sharing

Document sharing

torisob [31]2 years ago
4 0

Answer:

B, D, E is the answers I think

You might be interested in
Which term refers to a shorthand method for identifying network and host bits in an ip address?
zloy xaker [14]

A CIDR Notation is known as the term that refers to a shorthand method for identifying network and host bits in an ip address.

<h3>What is CIDR Notation?</h3>

This is known to be a term that was devised in 1993 by the IETF. The  CIDR is said to be a  shorthand method for knowing network and host bits in an IP address.

Therefore, one can say that A CIDR Notation is known as the term that refers to a shorthand method for identifying network and host bits in an ip address.

Learn more about CIDR Notation from

brainly.com/question/14985928

#SPJ12

7 0
1 year ago
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
Why do we install doorbells in our house
Vinil7 [7]

Explanation:

It's placed near the door. When a visitor presses the button, the bell rings inside alerting you that someone is at the door.

6 0
2 years ago
Read 2 more answers
Which of the following is an example of joint problem solving?
tatuchka [14]

Explanation:

There is a high degree of informality to these relationships, which are focused on information sharing, joint-problem solving and joint operations.

A hallmark of most of these processes is their informality, whether through information sharing, joint problem solving or joint operations.

Global joint problem-solving team. In addition to requesting a division of labour, the Global Task Team recommendations called upon the World Health Organization (WHO), UNICEF, the United Nations Population Fund (UNFPA), the United Nations Development Programme (UNDP), the World Bank, the UNAIDS Secretariat and the Global Fund to take the lead in and establish the joint United Nations system-Global Fund problem-solving team by July # in order to support efforts that address implementation bottlenecks at the country level

4 0
3 years ago
After class, Anita and Bev make plans to study for their psychology exam together but cannot decide on a time or location. In ad
Paladinen [302]

Answer:

Option B; 30 SECONDS OR LESS.

Explanation:

Short-term memory, also known as primary or active memory, is the information we are currently aware of or thinking about.

When short-term memories are not rehearsed or actively maintained, they last mere seconds.

Most of the information kept in short-term memory will be stored for less than 30 seconds (approximately 20 to 30 seconds), but it can be just seconds if rehearsal or active maintenance of the information is not done.

Therefore, Anita likely will be able to retain the information in short-term memory, without additional processing, for 30 SECONDS OR LESS.

8 0
3 years ago
Other questions:
  • Which of the following is an important initial step in designing an interface
    7·1 answer
  • A computer that no longer works after having minor repair works done to it may have been damaged by
    8·2 answers
  • . The toasting cycle of an automatic toaster is started by A. pushing the bread rack down. B. pushing the start button. C. turni
    14·2 answers
  • A parameter is a numerical measure that describes a characteristic of a sample. Choose One • 4 points True False
    6·1 answer
  • Whats the answer to this question?
    7·1 answer
  • 4. An abstract data type is defined as _____.
    14·1 answer
  • Who developed the idea of a universal network?
    11·1 answer
  • Erewrxdnnefwn q wedsvd
    6·1 answer
  • Answered
    10·1 answer
  • I have a problem. I can't cycle between game packs on my strike pack, I've watched so many vids I'm on Xböx and I'm holding the
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!