Answer:
2737
Step-by-step explanation:
Let's translate the verbal language to algebraic language.
She rides to and from school 5 days per week, 6.25 miles each route => 5*2*6.25 miles = 62.5 miles.
She rides additioanly around the park 2.5 miles for each trip t => 2.5*t = 2.5t
Total miles of her rides per week: 62.5 miles + 2.5t
She wants to ride minimum 85 miles => 62.5 + 2.5t ≥ 85
Then, the situation is represented by this inequality:
2.5t + 62.5 ≥ 85
You can develop it and get to several equivalent inequalities, for example:
2.5t ≥ 85 - 62.5
2.5t ≥ 22.5
t ≥ 9
Any of the four forms are equivalent and a valid answer.
Answer:

Step-by-step explanation:
Given that,
The dimensions of an aquarium are 61 cm long, 30.5 cm wide, and 30.5 cm high.
The tank is filled to 80% capacity with water.
We need to find the water needed for this tank.
The volume of cuboid is given by :

As it is filled to 80% capacity, so,

So,
of water is needed for this tank.
Answer:
A. 2 terms; variable = x; constant = 4.5 -------> 4.5 - 2x
B. 2 terms; variables = x and y -----------> 4.5y - 2x
C. 3 terms; variables = x and y; constant = 2 --------------> 4.5x + 2 - 3y
D. 3 terms; variables = x and y; constant = 3 --------------> x - 2y + 3
Its 100% correct just not in the order you put it in, I think you might of switched them but I just did the Warm-Up and its right my dudes :)
Answer:
72 kg
Step-by-step explanation:
For concreatting a tower cement, sand, stones are in the ratio 1:2:4 For 144kg sand.. What amount of cement is required?
We are given the ratio
cement: sand:stones
= 1:2:4
The sum of proportion =
1 + 2 + 4 = 7
We are given the kg of sand = 144kg
Step 1
We find the total kg of cement, sand and stones = x
Using the proportion of sand,
2/7 of x = 144kg
2/7 × x = 144kg
2x/7 = 144kg
Cross Multiply
2x = 7 × 144kg
x = 7 × 144kg/2
x = 504kg
Therefore the total kg of cement, sand and stone = 504kg
Step 2
The amount of cement required is calculated as:
1/7 × 504 kg = 72 kg
Therefore, 72kg of cement is required.