Answer:
See attachment for flowchart
Explanation:
Required
Flowchart to fine even from 1 to 50
The flowchart has been attached.
The rough algorithm (explanation) of the flowchart is as follows.
1. Start
2. Initialize num to 1
3. Check if num is less than or equal to 50
3.1 If yes
3.1.1 Check if num is even
3.1.1.1 If yes
3.1.1.2 Print num
3.1.3 Increase num by 1
3.2 If num is greater than 50
3.2.1 Stop
4. Goto 3
Mike needs to write the primary objectives of a project in a project plan. He should write this under the SCOPE section of the project plan.
Explanation:
- Project scope is the part of project planning that involves determining and documenting a list of specific project goals, deliverables, features, functions, tasks, deadlines, and ultimately costs.
- It is what needs to be achieved and the work that must be done to deliver a project.
- The Scope of Work (SOW) is the area in an agreement where the work to be performed is described.
- The SOW should contain any milestones, reports, deliverables, and end products that are expected to be provided by the performing party. The SOW should also contain a time line for all deliverables.
- The scope is simply all the work that needs to be done in order to achieve a projects objectives.
- A project scope, or project scope statement, is a tool used to describe the major deliverables of a project including the key milestones, high level requirements, assumptions, and constraints.
A book recommended from your professor is a reliable source of information.
Answer: 500 volts AC, 750 volts DC
Class 00 rubber gloves are given the color "beige" based on the color code of rubber gloves.
The proof test voltage for this class of rubber gloves is 2500 volts of AC voltage and 10000 volts of DC voltage