1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Leviafan [203]
3 years ago
11

For A and B, use the indicated operations to find the answer

Mathematics
1 answer:
anastassius [24]3 years ago
4 0

Step-by-step explanation:

Your question is not well understood

You might be interested in
Find the two square roots of 144.
spin [16.1K]

Answer:

The square root function

sqrt(144) or √144 produces a single positive value, 12.  

However if you have an equation

x² = 144, then you have two possible values for x, 12 and -12.  

Two ways to look at it.  

x² - 144 = 0

Difference of two squares

(x+12)(x-12) = 0

x = -12, 12

x² = 144

x = ±√144

x = ±12

x = -12, 12

4 0
3 years ago
Read 2 more answers
Help Me With This Question Please!
Georgia [21]

Answer:

60°

Step-by-step explanation:

x + 160° + 140° = 360°

x + 300° = 360°

x = 360° - 300°

x = 60°

8 0
3 years ago
Michael is making a card for his dad's birthday. He's shaded a triangular section on the card where he wants to write his dad a
artcher [175]

Answer:

Option C (72)

Step-by-step explanation:

In the figure attached we can see a rectangle ABCD with length 12 cm and width 9 cm.

A  triangle PEF with height BE and base EF.

Since side AE = 3 cm, so side EB = EC = 9 - 3 = 6cm

and EF = AD = 12 cm

Now we will find the area of of the parts of the card that are not shaded.

Area of parts that are not shaded = Area of rectangle - area of shaded triangle

= (12×9) -

= 108 -

Option c) 72 cm² is the area of non shaded part.

Hope this helps!! -Mina

7 0
2 years ago
Read 2 more answers
a worker A finishes a project on his own in 12 days. the worker completes the same work alone in 16 days. the two workers starte
ankoles [38]

Answer:

<em>Worker B needs 9 days to finish the rest of the work</em>

Step-by-step explanation:

<u>Proportions</u>

Worker A finishes a project on his own in 12 days and worker B does the same in 16 days.

Worker A does 1/12 of the project in one day and worker B does 1/16 of the project in one day. When working together, they do

\frac{1}{12}+\frac{1}{16}=\frac{7}{48}

After 3 days they have completed:

3*\frac{7}{48}=\frac{7}{16}

parts of the project, this means it still remains:

1-\frac{7}{16}=\frac{9}{16}

parts of the project and it is done by B alone. Since B does \frac{1}{16} per day, he now takes

\displaystyle \frac{\frac{9}{16}}{\frac{1}{16}}=9

days to complete the project.

Worker B needs 9 days to finish the rest of the work

4 0
3 years ago
Add 7 and 3 8ths meters plus 6 and 1 third meters. Does the sum belong to the set of rational number integers or whole numbers?
PSYCHO15rus [73]
Rational number integers because the sum using (LCD) is 13 and 17/24. Therefore, the answer can not be a whole number because it is in a fractional form. You can also put this number in a rational for which would be 312/24. This proves that it is a rational number.
7 0
4 years ago
Other questions:
  • The smallest prime fractor of twelve is what
    8·1 answer
  • Find the value of X if m is parallel to n
    8·1 answer
  • Consider the polynomial, 5x 9x 2x11 6.
    6·1 answer
  • PLEASE HELP IM SO CONFUSED <br> Which expression gives the volume of a sphere with radius 8?
    14·1 answer
  • Determine whether the following sample may be biased and explain.
    14·1 answer
  • The circle has a radius of 5 cm. Find the circumference. Give your answer to the nearest tenth. Use pi on your calculator. DO NO
    5·2 answers
  • 4. Use the distributive property to solve the equation below.<br> 3(n +5)= 33
    13·1 answer
  • 29 POINTS PLUS BRAINLIEST PLEASE ANSWER THESE MATH QUESTIONS.ALL TROLL ANSWERS WILL BE REPORTED MUST BE DONE IN 20min OR.LESS.
    8·2 answers
  • Is 6 and 9 like terms or unlike terms
    9·1 answer
  • The cheerleaders held a car wash to raise money for new uniforms they spent $15 on soap and eight dollars on sponges rags in a b
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!