Answer:
a) 1/800 or 0.00125
b) i) 0.0013
ii) 0.001
c) 60%
Step-by-step explanation:
T = [tan(2×30)+1][2cos(30)-1] ÷ (y²-x²)
T = (tan60 + 1)(2cos30 - 1) ÷ (41² - 9²)
T = (sqrt(3) + 1)(sqrt(3) - 1) ÷ 1600
T = (3-1)/1600
T = 2/1600
T = 1/800
T = 0.00125
Error: 0.002 - 0.00125
0.00075
%error
0.00075/0.00125 × 100
60%
ANSWER:
Angles 2 and 4 are vertical angles, which means they have the same angle measure because they are opposite of each other. So angles 2 and 4 are both 114 so that makes 228. All of the angles have to make 360, so 360 - 228 = 132. Then, 132/2 because there are two angles. That makes 66. And angles 1 and 3 are also vertical angles so they are also the same
The answer is 132
That would be 1/8 times 288, so the answer would be 36 part time workers.
Using the normal distribution, it is found that 7.64% of of sample means are greater than 8.8 hours.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
- By the Central Limit Theorem, the sampling distribution of sample means of size n has standard deviation
.
The parameters are given as follows:

The proportion of sample means greater than 8.8 hours is <u>one subtracted by the p-value of Z when X = 8.8</u>, hence:

By the Central Limit Theorem


Z = 1.43
Z = 1.43 has a p-value of 0.9236.
1 - 0.9236 = 0.0764.
7.64% of of sample means are greater than 8.8 hours.
More can be learned about the normal distribution at brainly.com/question/25800303
#SPJ1