Answer:
c. the exchange of goods and services for goods and services without the use of money
Explanation:
Barter the exchange of goods and services for goods and services without the use of a medium of exchange such as money.
In a barter, money doesn't change hands.
An example of a barter- I want a pair of shoes worth $30. I see someone that has the shoes but wants textbooks worth $30. I have these textbooks. I give him the textbooks and he gives me the shoes.
I hope my answer helps you
Answer:
$256,284
Explanation:
The computation is shown below:
First, Calculate the predetermined overhead rate per hour which equals to
= (Estimated manufacturing Overhead cost ÷ estimated machine hours)
= ($235,900 ÷ 20,800 hours)
= $11.34 per hour
So, the applied overhead or manufacturing overhead allocated equals to
= Predetermined overhead rate per hour × actual machine hours
= $11.34 per hour × 22,600 hours
= $256,284
Answer:
C. $9.50 per direct labor-hour
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)
where,
Total estimated manufacturing overhead equals to
= Total fixed manufacturing overhead cost + Direct labor hours × variable manufacturing overhead per direct labor-hour
= $497,000 + 70,000 × $2.40
= $497,000 + $168,000
= $665,000
And, the direct labor-hours is 70,000
So the rate is equal to
= $665,000 ÷ 70,000
= $9.5 per direct labor-hour
Answer:
E) existing factory has enough capacity to handle demand for the new products as well as the existing products.
Explanation:
If the existing factory doesn't have enough capacity to produce both the new product and existing ones, then if doesn't matter if the technology used is the same, or the new product is an extension of an existing product line, or existing human resources possess the abilities and knowledge required, or even if the product design is already complete or not.
If the factory's production capacity cannot handle the new product, then the company needs to expand the existing factory's production capacity or build a new facility.
The process being employed in the scenario above is called
quality control. This is a system being used in means of maintaining standards
with the use of testing out samples or products in order to check and maintain
the standards that has been implemented.