1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
yulyashka [42]
2 years ago
11

Could someone please answer only 22 for me please, don’t understand

Mathematics
1 answer:
Rasek [7]2 years ago
8 0

Answer:

p = 10

Step-by-step explanation:

3p + 10 + 5p = 90

8p + 10 = 90

90 - 10 = 80

80 / 8 = 10

You might be interested in
An engineer is building a bridge that should be able to hold a maximum weight of 1 ton. He builds a model of the bridge that is
MrRissso [65]

Answer:

First blank- 32000 ounces

Second blank- 2000 pounds

Yes the bridge can hold 1 ton.

Step-by-step explanation:

The ratio of the scale of the model to the real bridge = 1:4

The test model shows the model can take 8000 ounces

The real bridge will therefore take 8000 x 4 = 32000 ounces

16 ounces = 1 pound

32000 ounces =  x pounds

==>  = 32000/16 = 2000 pounds

2000 pounds = 1 ton

therefore the bridge holds 1 ton

6 0
2 years ago
Read 2 more answers
Evaluate the expression 5(-3) using a number line.​
MArishka [77]

Answer: -15

Step-by-step explanation:

7 0
2 years ago
Read 2 more answers
Esther has a farm.
Gnesinka [82]

Here, we are required bro determine how many worker Esther needs to employ to pick the same 600kg of onions in 3 hours as compared to 4 hours from last year.

This year, she needs to employ 32 workers to pick a total of 600kg of onions in 3 hours.

According to the data given, the total quantity of onions to be picked still remains 600 kg as from last year, only that she needs it done in 3 hours now.

Therefore,

  • Since 24 workers finished the work in 4 hours,
  • This means that 96 workers are needed to finish the work in 1 hour( from 24×4 = 96).

Therefore, since the work needs to be done in 3 hours this year, This means that it can be shared between X no. of workers.

  • Where X = 96/3= 32

Therefore, this year she needs to employ 32 workers to pick a total of 600kg of onions in 3 hours.

Read more:

brainly.com/question/3796978

4 0
2 years ago
Someone please help me!
maw [93]

Vas happenin!


The answer is

57 pi ft squared


Hope this helps


-Zayn Malik
3 0
2 years ago
A. 812r) and 100
White raven [17]

Answer is C.9(3r-4) and 27r-36

Step-by-step explanation:

5 0
2 years ago
Other questions:
  • 4.2 m = _____ ft? Help meeeeee
    5·2 answers
  • The minimum wage in 2003 was $5.15. This was W more than the minimum wage in 1996. Write an expression for the minimum wage in 1
    11·2 answers
  • 1.<br> Which image is a reflection of the figure shown over the given line of<br> reflection?
    8·2 answers
  • Which equations are in standard form? Check all that apply
    8·2 answers
  • A line has a slope of -7 over four and passes through the point (4, -7 ) What is its equation in slope intercept form
    13·1 answer
  • A statistics teacher conducted an experiment to test whether the use of a new review booklet will improve her students' semester
    12·1 answer
  • Please help me on the following if possible :)
    9·1 answer
  • Pls Answer This gyys ​
    15·2 answers
  • The length of a rectangle is 6 inches longer than its width. The perimeter of the rectangle is 28 inches. If x represents the
    5·1 answer
  • What are some<br> relationships between<br> intersecting lines?
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!