Your answer: -0.8
first you would add all of your temperatures together which would give you -5.6
then you would divide -5.6 by 7 because u have 7 numbers
which would give you your answer!
hope this helps, good luck!
Work=speed times time (my equation to help me figure it out)
ok, 10 men take 84 days to complete a job
therefor, each man completes 1/10 of the job in 84 days
each man does 1/840 of the job per 1 day
so, if we had 5 more, or 15 men
15 times 1/840 times xdays=1 job complete
15/840 times xdays=1job
times both sides by 840/15
xdays=840/15
xdays=56
56 days it would take
Answer:
respect the traditions and beliefs
The answer is B f(x)= -3(x+1)^2+2
Answer:
Option B
y coordinate is 0
Step-by-step explanation:
We have in two dimension rectangular system of coordinates with two mutually perpendicular lines called x and y axis.
X axis is the horizontal line and y the vertical line, the point of intersection of these two lines is called origin with x=0: y=0
To the right of origin, positive values are marked and left negative. Similarly for y axis, above origin positive values and below negative values.
Thus we have along x axis, y values to be 0
Hence any point on x coordinate will be of the form (a,0) where a can be any real number
So option B is right