1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Dima020 [189]
3 years ago
12

Should advertisers be allowed to say anything they want to about their own products

Social Studies
1 answer:
bixtya [17]3 years ago
5 0

Answer:

i dont think so maybe......

You might be interested in
How many congressmen are in the house of representatives
Blababa [14]

Answer:

435 congressmen in the house of representatives

Explanation: There are a total of 535 members of the legislative branch of the US Federal Govt. 100 serve in the U.S. Senate and 435 serve in the U.S. House of Representatives.

7 0
3 years ago
PLEASE HELP ME !!!!!!!<br> BRAINLIEST WILL BE GIVEN !<br> LIMITED TIME
Vinvika [58]
Horses. That's the only thing from the words that are given to you.
But they also gave raw goods, spices, and slaves.

Hope this helps!
Brainliest would be appreciated! 
X3
6 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Which of the selections below reflect some of the United States’ basic foreign policy goals?
svetlana [45]

Answer:

The correct answer is C.

Explanation:

In addition to all of its self-interested goals in international affairs, such as maintaining strategic military defenses or signing advantageous trade agreements, the United States has historically supported all of these goals (human rights, self-determination, and peace) on the world stage.

7 0
3 years ago
According to a recent longitudinal study conducted by Miech and colleagues (2016), approximately _____ percent of high school se
Annette [7]

The longitudinal study shows that 55% of high school seniors in 2016 reported experimenting with marijuana in the last year.

<h3>What is a marijuana?</h3>

This is a cannabis plant that is smoked or consumed and acts as a psychoactive drug for the user,

This longitudinal study shows that 55% of high school seniors in 2016 reported experimenting with marijuana in the last year.

Read more about marijuana

<em>brainly.com/question/13610689</em>

#SPJ1

5 0
2 years ago
Other questions:
  • You go to several elementary schools where you test students who are in the first grade, third grade, and sixth grade to examine
    10·1 answer
  • Please I really need help on this can’t seem to get it right
    12·1 answer
  • Which part of a mountain receives the majority of moisture due to the rain shadow effect?
    13·2 answers
  • It is 1970, and a development worker hopes to understand Mexican peasant families before intervening to improve their lives. Thi
    10·1 answer
  • ​from a contemporary __________ perspective, children are active and creative agents, not just passive recipients of the sociali
    10·1 answer
  • Posting a message to a discussion forum that is completely off topic or appears to be promoting something may be considered ____
    9·2 answers
  • What four kinds of habit-forming drug use at the start of the 20th century caused social reactions leading to the passage of fed
    7·1 answer
  • Which of the following powers does the president share with Congress?
    10·1 answer
  • What is social participation why is it important for socialization​
    8·1 answer
  • Describe two similarities and differences among jainism, buddhism, and hinduism.
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!