The distance between is =|9|+|-6|=15.
We can find that

So 2/5 of the AB segment is 6 distance points away from A at point C=0.
Answer:
The 90 % confidence interval for the mean population is (11.176 ; 20.824 )
Rounding to at least two decimal places would give 11.18 , 20.83
Step-by-step explanation:
Mean = x`= 16 miles per hour
standard deviation =s= 4.1 miles per hour
n= 4
= 4.1/√4= 4.1/2= 2.05
1-α= 0.9
degrees of freedom =n-1= df= 3
∈ ( estimator t with 90 % and df= 3 from t - table ) 2.353
Using Students' t - test
x`±∈ * 
Putting values
16 ± 2.353 * 2.05
= 16 + 4.82365
20.824 ; 11.176
The 90 % confidence interval for the mean population is (11.176 ; 20.824 )
Rounding to at least two decimal places would give 11.18 , 20.83
<span>7e^(×/3)=14
</span><span>e^(×/3)=14/7
</span>e^(×/3)=2
take ln of both sides;
lne^(×/3)=ln2
****You should be familiar that lne^x=x as ln is the inverse function of e and vice versa****
then;
x/3=ln2
x=3ln2
x approximately is equal to 2.1
6035 theres nothing to take from or add to it
Answer:
$690.86
Step-by-step explanation:
100% from the original cost is: 2 x 863.57 = $1,727.14
40/100 = X/1727.14 (40 percent is what of 1,727.40) (%/100 = is/of)
(40 * 1,727.14) / 100 = $ 690.86