7/2= 3 1/2, 12/5= 2 2/5, 11/7= 1 4/7, 15/4= 3 3/4
Answer:
(4,0)
Step-by-step explanation:
It is a linear function so you find the slope by doing y2-y1/x2-x1 and you find the slope to be 1/2. You can then setup an equation using it and graph it to find the next value.
Finding the regression equation, her average speed on the 9th day should be expected to be of 6.92 minutes per mile.
<h3>How to find the equation of linear regression using a calculator?</h3>
To find the equation, we need to insert the points (x,y) in the calculator.
Researching the problem on the internet, the values of x and y are given as follows:
- Values of x: 1, 2, 3, 4, 5, 6.
- Values of y: 8.2, 8.1, 7.5, 7.8, 7.4, 7.5.
Hence, using a calculator, the equation for the average minutes per mile after t days is given by:
V(t) = -0.15143t + 8.28
Hence, for the 9th day, t = 9, hence the estimate is:
V(9) = -0.15143(9) + 8.28 = 6.92 minutes per mile.
More can be learned about regression equations at brainly.com/question/25987747
#SPJ1