Answer:
C. 39.6
<em>good luck, i hope this helps :)</em>
Answer:

Step-by-step explanation:
The equation of a line:

We have

substitute:

The formula of a distance between a point and a line:
General form of a line:

Point:

Distance:

Convert the equation:
|<em>subtract
from both sides</em>
|<em>multiply both sides by 3</em>

Coordinates of the point:

substitute:


|<em>multiply both sides by
</em>
|<em>divide both sides by 3</em>

Finally:

Answer:
see below. The solution is the doubly-shaded area.
Step-by-step explanation:
Each boundary line will be dashed, because the "or equal to" case is <em>not included</em>. Each shaded area will be above the corresponding boundary line because the comparison symbol is y > .... That is, only y-values greater than (above) those in the boundary line are part of the solution.
Of course, the boundary lines are graphed in the usual way. Each crosses the y-axis at the value of the constant in its equation. Each has a slope (rise/run) that is the value of the x-coefficient in the equation.
Answer:
3 3/7 or 24/7 mins
Step-by-step explanation:
Let total job = X
Jeff's rate = X/6
Bob's rate = X/8
Combined rate = X/6 + X/8
(4X × 3X)/24 = 7X/24
7X/24 = X/T
T = X ÷ (7X/24)
T = X × (24/7X)
T = 24/7 mins
Shortcut:
T = product of individual times/sum of individual times
T = (6×8)/(6+8)
T = 48/14
T = 24/7
T = 3 3/7 mins