Answer:
6 2/9
Step-by-step explanation:
4 7/9 + 1 4/9
Since the denominators are the same, we can add
5 11/9
We need to fix the improper fraction
5 + 9/9 + 2/9
5+1+2/9
6 2/9
Hmmm A millimeter would be too big for that .
I think millionths of a meter would be about right. Micrometers.
As your testing H0:p=0.79, then you have a two-tailed test.
The p-value at two-tailed test is given by:

Then, you need to check into the standard normal cumulative table to find at which -z you do have a probability of 0.395. Thus:
As you can see in the picture at z=-0.26 you have a P(Z<=-z)=0.3974
And at z=-0.27 you have a P(Z<=-z)=0.3936.
The average of these values is:

Then, you have a probability of 0.395 at a z of:

Then -z=-0.27, thus z=0.27
Make the question more clear please and i think the stem and leaf plot is incorrect.
Answer:
Step-by-step explanation:
Slope: 7/1
y-intercept: (0,-4)
Start in the y-intercept (0,-4). Go up 7 and 1 to the right. You only need two points to trace a line.