1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
brilliants [131]
3 years ago
6

20 POINTS

Mathematics
1 answer:
adoni [48]3 years ago
3 0

Answer:

If 1 gallon = 16 cups, then 4 gallons = 64 cups. (16 x 4)

So if there are 4 gallons of water, then there are 64 cups. If 1 cup of water evaporates a minute then it will take 64 minutes for all the water to be gone.  

Answer: 64 minutes

OR

Answer: An hour and 4 minutes

Step-by-step explanation:

You might be interested in
Please help me.
BARSIC [14]

Answer:

A.) The greatest possible distance between any of the stakes is 53 feet.

B.) A triangle with sides 15, 36, and 39 is a right triangle and has perimeter 90 feet.

Step-by-step explanation:

Given - Fiona wants to rope off a triangular region in her yard for a vegetable garden. She has 90 feet of rope to use, she wants the distance between each stake to be an integer, and the distance between two of the stakes must be 36 feet.

To find - A. What is the greatest possible distance between any of the stakes?

B. If she wants to create a right triangular region and use all of the 90 feet of rope, what would be the lengths of the sides of the region?

Solution -

A.)

Let us assume that,

Length of side 1 = x

Length of side 2 = y

Length of side 3  = z

Now,

Given that,

She has 90 feet of rope to use

⇒x + y + z = 90

And

The distance between two of the stakes must be 36 feet.

So, Let z = 36.  

∴ we get

x + y + 36 = 90

⇒x + y = 90 - 36

⇒x + y = 54

Now,

Let x be as large as possible.

i.e. To make x to be large, y has to be as small as possible.

It happens when y = 1.

( We can not take y = 0, or else a triangle won't form)

∴ we get

y = 1

⇒x + 1 = 54

⇒x = 54 - 1

⇒x = 53

∴ we get

The greatest possible distance between any of the stakes is 53 feet.

B.)

We know that,

(5,12,13) is a Pythagorean triple.

Because 5² + 12² = 13²

So,

As, we have a Pythagorean triple,

This means a triangle with sides 5, 12, 13 is a right triangle.

Now,

If a triangle has sides 5, 12, 13,

⇒ The perimeter becomes 5 + 12 + 13 = 30.

By Triple each side we get,

Length of sides 15, 36, 39.

The perimeter i= 15 + 36 + 39 =  90

Also,

We can see that,

15² + 36² = 39².

This means we have a right triangle and (15, 36, 39) is another Pythagorean triple.

Because any scaled version of a Pythagorean triple, is also a Pythagorean triple.

∴ we get

A triangle with sides 15, 36, and 39 is a right triangle and has perimeter 90 feet.

6 0
3 years ago
The two sides of a triangle have lengths 4 and 10. The third side of the triangle can be?
spin [16.1K]

Answer:

10.77

Step-by-step explanation:

If you use the pythagorean theorem to find the hypotenuse, you should get 10.77

4 0
3 years ago
PLEASE HELP Find the area of the rectangle, to the nearest hundredth, with a base of 5 inches and a height = 2.5 inches. Type a
il63 [147K]

Answer:

The area of a rectangle with a width of 5 inches, and a height of 2.5 inches, would have an area 12.5 inches!

Step-by-step explanation:

To find the area of a rectangle, simply multiply the width (W) by the length (L) to find the area (A) of the rectangle.

A = W x L

A = 5 inches x 2.5 inches

A = 12.5 inches

Hope this helps! :)

5 0
3 years ago
Find the equation of a line given the slope is 2 and Contains the point (0,0).
strojnjashka [21]

Answer:

y=2x

Step-by-step explanation:

y=mx+b

If it crosses through the point (0,0) it means that the y intercept (b) is 0.

m=slope

Not sure how to show you the graph but it is simply a diagonal line through (0,0) that will hit (1,2), (2,4), etc.

5 0
3 years ago
Read 2 more answers
Problem 7.43 A chemical plant superintendent orders a process readjustment (namely shutdown and setting change) whenever the pH
vaieri [72.5K]

Complete Question

Problem 7.43

   A chemical plant superintendent orders a process readjustment (namely shutdown and setting change) whenever the pH of the final product falls below 6.92 or above 7.08. The sample pH is normally distributed with unknown mu and standard deviation 0.08. Determine the probability:

(a)

of readjusting (that is, the probability that the measurement is not in the acceptable region) when the process is operating as intended and \mu = 7.0 probability

(b)

of readjusting (that is, the probability that the measurement is not in the acceptable region) when the process is slightly off target, namely the mean pH is \mu = 7.02

Answer:

a

The value is  P(X < 6.92 or X > 7.08 ) =  0.26431  

b

The value  is P(X < 6.92 or X > 7.08 ) =  0.29344  

Step-by-step explanation:

From the question we are told that

  The mean is  \mu =  7.0

  The standard deviation is  \sigma  =  0.08

Considering question a

Generally the probability of readjusting when the process is operating as intended and mu  7.0 is mathematically represented as

       P(X < 6.92 or X > 7.08 ) =  P(X <  6.92  ) + P(X > 7.08)

=>    P(X < 6.92 or X > 7.08 ) =  P(\frac{X - \mu }{\sigma} < \frac{6.9 - 7}{0.08}  ) + P(\frac{X - \mu}{\sigma} >  \frac{7.08 - 7}{0.08} )

Generally

 \frac{X - \mu }{\sigma} = Z(The \  standardized \  value \ of \  X)

So

=> P(X < 6.92 or X > 7.08 ) =  P(Z < \frac{6.9 - 7}{0.08}  ) + P(Z >  \frac{7.08 - 7}{0.08} )    

=> P(X < 6.92 or X > 7.08 ) =  P(Z < -1.25) + P(Z >  1 )  

From the z table the probability of  (Z < -1.25) and  (Z >  1 ) is  

       P(Z < -1.25) =  0.10565

and

      P(Z >  1 ) = 0.15866

So

=> P(X < 6.92 or X > 7.08 ) =  0.10565 + 0.15866      

=> P(X < 6.92 or X > 7.08 ) =  0.26431      

Considering question b

Generally the probability of readjusting when the process is operating as intended and mu  7.02 is mathematically represented as

       P(X < 6.92 or X > 7.08 ) =  P(X <  6.92  ) + P(X > 7.08)

=>    P(X < 6.92 or X > 7.08 ) =  P(\frac{X - \mu }{\sigma} < \frac{6.9 - 7.02}{0.08}  ) + P(\frac{X - \mu}{\sigma} >  \frac{7.08 - 7.02}{0.08} )

Generally

 \frac{X - \mu }{\sigma} = Z(The \  standardized \  value \ of \  X)

So

=> P(X < 6.92 or X > 7.08 ) =  P(Z < \frac{6.9 - 7.02}{0.08}  ) + P(Z >  \frac{7.08 - 7.02}{0.08} )    

=> P(X < 6.92 or X > 7.08 ) =  P(Z < -1.5) + P(Z >  0.75 )  

From the z table the probability of  (Z < -1.5) and  (Z >  0.75 ) is  

       P(Z < -1.5) = 0.066807

and

      P(Z >  0.75 ) = 0.22663

So

=> P(X < 6.92 or X > 7.08 ) = 0.066807 + 0.22663      

=> P(X < 6.92 or X > 7.08 ) =  0.29344      

6 0
3 years ago
Other questions:
  • What is the measure of angle Xyz
    14·1 answer
  • Ming was planning a trip to Western Samoa. Before going,she did spme research and learned that the exchange rate is 6 Tala for $
    5·2 answers
  • The points J (-13,10) and K(-1,-6) are endpoints of a diameter of circle G. What is the equation of circle G?
    6·2 answers
  • I don’t understand question 7
    7·1 answer
  • Order these numbers from least to greatest
    13·2 answers
  • A box on kitty litter is 8 3/4 inches tall. How many boxes can be stacked on a shelf in the warehouse that is 40 inches tall?
    6·1 answer
  • PLEASE HELP mE: Simplify the expression 5c - 4 + 2c +6
    10·1 answer
  • The expression (x-5)^2 is equivalent to...
    7·1 answer
  • Hey i have a code if anyone wants to play among us UUPAKF
    7·1 answer
  • This week, 967 people went to the beach. Last week, 1,189 people went to the beach. The number of people who went to the beach f
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!