The answer is 10 days
(after 4 days, they still needed to install 360 chairs, 600-360=240 - meaning they installed 240 chairs in 4 days. to find out how many chairs they installed in 1 day, divide 240 by 4 and you find they installed 60 chairs per day. Then divide 360 by 60 to find the remaining days needed to install the rest of the chairs, which is 6 days then add it onto the 4 days already completed)
75% of 340 is 85 so 85 laptops were sold at Best Bargin
Step-by-step explanation:
maybe this is not the full expression, as you wrote the line equation in a funny way.
I understand the following :
the line is
y = (-2/5)×x - 7
perpendicular means crossing at a right angle (90 degrees).
the slope of the original line is -2/5.
as in every line equation, the slope is the factor of x. and it expresses the ratio y/x indicating the amount of units y is changing, when x changes a certain amount of units (e.g. when going from one point on the line to another).
the perpendicular slope turns the original y/x ratio upside-down, and also flips the sign.
so, it is 5/2.
the equation for the perpendicular line looks like
y = (5/2)×x + b
now what is b ?
for this we use the specified point on the line : (4, -1)
and we put these values as x and y into the equation :
-1 = (5/2)×4 + b = 5×2 + b = 10 + b
b = -11
and so, the full equation of the perpendicular line is
y = (5/2)×x - 11
Answer: 8x + 7 = ?
Step-by-step explanation: There isn't anything on the other side so all I can do is simplify the left.
Each train carried 64141 kg of flour and each truck carried 9163 kg of flour.
Step-by-step explanation:
Let the no. of kg of flour carried by each train be 'a'
Let the no. of kg of flour carried by each truck be 'b'
Total flour = 403172 kg
No. Of trains = 5
No. of trucks = 9
a = 7(b)
5a + 9b = 403172
5(7b) + 9b = 403172
35b + 9b = 403172
44b = 403172
b = 403172/44
b = 9163
Each truck carried 9163 kg of flour.
a = 7b
a = 7(9163)
a = 64141
Each train carried 64141 kg of flour.