Answer:
The probability that a vehicle passing through this construction zone will exceed the posted speed limit is 0.9332.
Step-by-step explanation:
Let <em>X</em> denote the speeds of vehicles passing through the construction zone.
It is provided that <em>X</em> follows a normal distribution with parameters <em>μ</em> = 46 and <em>σ</em> = 4.
The posted speed limit is of 40 miles per hour.
Compute the probability that a vehicle passing through this construction zone will exceed the posted speed limit as follows:

Thus, the probability that a vehicle passing through this construction zone will exceed the posted speed limit is 0.9332.