1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
belka [17]
3 years ago
7

Based on the weathering patterns, guess the rock type shown in each photo.

Biology
1 answer:
lesantik [10]3 years ago
3 0

Answer:

Granite and sandstone

You might be interested in
The organism Feline domesticus is a member of the genus:
Ostrovityanka [42]
Felis domesticus & Felis silvestris. They both belong to the same genus (cats).
8 0
3 years ago
What type of bond is shown below, where a weak bond is formed between partially charged molecules that contain hydrogen atoms?
maw [93]
Its a covalent bonding
8 0
3 years ago
Read 2 more answers
What do members of a population have in common? Select all that apply.
Amanda [17]

Answer:

Explanation:they live in the same area

8 0
3 years ago
Prokaryotes are classified as belonging to two different domains. What are the domains?
Basile [38]

Answer:

Bacteria and Archaea

Explanation:

The prokaryotes are classified into two domains, the bacteria and the archaea domains. This makes them unique as the other organisms fall into one of the three domains, not in two of them. The prokaryotes come in many different shapes. They all do fall into three categories, bacilli (which are the rod-shaped prokaryotes), spirilli (which are the spiral-shaped prokaryotes), and cocci (which are the spherical shaped prokaryotes).

6 0
3 years ago
What is the estimated expected (mean) time for project completion?
il63 [147K]
The estimated expected (mean) time for project completion is 50 weeks, time management includes all the activities necessary to achieve the target date of delivery of the project. It includes the following activities: identification of activities, logical sequencing of activities, estimation of duration of activities, and preparation of the project schedule. For the preparation of the schedule we will see various methods such as resource leveling, simulation, and the critical chain method.
3 0
3 years ago
Other questions:
  • Explain the difference between endothermic and ectotherms. I have a time limit for this, it is due in about 5 hours. Please help
    5·1 answer
  • 4. What are some of the hazards that domestic pets like dogs and cats can experience in regard to poisons? How are pets exposed
    5·1 answer
  • Using the drop-down menus, identify the
    7·2 answers
  • How do lymphatic capillaries differ from blood capillaries?
    12·1 answer
  • How to tell the difference between serrano and jalapeno?
    12·1 answer
  • Please help ?!!!!!!!!
    9·2 answers
  • The main difference between an ecosystem and a community is-
    15·1 answer
  • Why do scientists use Punnett squares?
    7·2 answers
  • 10. Name the pigments present in plants which can absorb solar energy.
    10·1 answer
  • When the spine curves inward at the low back this is referred to as
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!