Answer:
A) probability that at least x of them will require repairs is less than 0.5 is 4
Step-by-step explanation:
sample size, n = 20
p = success probability of toaster = 0.2
q = failure probability of toaster =1- p = 1- 0.2 =0.8
mean, , μ = n * p = 20 * 0.2 = 4
standard deviation, 
a) the probability that at least some of them require repairs < 0.5.
for
value of z = 0
we know 
from z table
X = 4
B) SECOND PART IS INCOMPLETE { DATA IS INCOMPLETE}
Answer: x = 5/2 or 2.5
Step-by-step explanation:
1/4x = 5/8
To find the value of X;
We multiply both sides by 4
1/4 x × 4 = 5/8 × 4
x = 5/2 or 2.5
Answer: They are inverses of each other.
Explanation:
f(x) = -x+5
f(g(x)) = -(g(x)) + 5
f(g(x)) = -(-x+5) + 5
f(g(x)) = x - 5 + 5
f(g(x)) = x
The steps to show that g(f(x)) = x are identical to what is shown above. This is because both f(x) and g(x) are the same.
Since f(g(x)) = x and g(f(x)) = x are true, this means the functions are inverses of each other.
Answer: -2/7
Slope is change in Y over change in X
Change in y: 1-3 = -2
Change in x = 2-(-5) = 7