Ralph hires 8 workers
What is variable cost ?
Variable costs are expenses that alter as the volume of a good or service a company produces fluctuates. Marginal costs multiplied by the number of units produced make up variable costs. They can be regarded as typical expenses as well. Total cost is divided into two parts: fixed costs and variable costs.
Workers paid = $100
Assuming $1600 is given as a Total cost for the 2000 quantity for chicken and Fixed cost is $800
Total cost = $1600 out of which $800 is the fixed cost
Variable cost = Total cost - Fixed cost
= 1600 - 800
= 800
Numbers of workers hired = Variable cost / Workers pay
Numbers of workers hired = 800 / 100
Numbers of workers hired = 8
Therefore, the number of workers that Ralph hires is 8 workers
To learn more about variable cost from the given link
brainly.com/question/14313017
#SPJ4
Answer:
Step-by-step explanation:
Equation of the line has been given as,

By comparing this equation with the y-intercept form of the equation,
y = mx + b
Slope of the line 'm' = 
and y-intercept 'b' = -5
Table for the points to be plotted on a graph will be,
x y
-4 -11
-2 -6
0 -5
2 -4
4 -3
By plotting y-intercept (0, -5) and any one of the points given in the table we can get the required line.
<span>A Japanese beetle’s length are equals to
=> 0.3 inches
=> 0.5 inches
Now let’s find the length that is between the span of the two given length:
But before that let’s convert the 2 given numbers in decimal points to
fraction:
=> 0.3 = 3/10
=> 0.5 = 5/10
Find the fraction between the given 2 numbers:
=> 0.3
=> 0.4
=> 0.5
Therefore the number we are looking 0.4
=> 0.4 = 4/10
Now, we have the complete length of Japanese beetles, the 0.3, 0.4 and 0.5</span>
Answer:
Upper Right
Step-by-step explanation:
All of them have different dips, therefore the one facing in a different direction must be the odd one out.