Answer:
The total is 90%
Step-by-step explanation:
Hope this helps! ^^
Answer:
The question is not complete, nut here is the complete question ; A company produces alarm clocks. During the regular workweek, the labor cost for producing one clock is $4.00. However, if a clock is produced on overtime, the labor cost is $5.00. Management has decided to spend no more than a total of $51,000 per week for labor. The company must produce 12,000 clocks this week. What is the minimum number of clocks that must be produced during the regular workweek?
Step-by-step explanation:
Tthe detailed analysis and step by step calculation is as shown in the attached file.
Answer:
He can buy 5 pounds of peaches.
Step-by-step explanation:
2 pomegranates cost $3.18 so, subtract that from $10.00 and you get $6.82. Multiply the different number of pounds with the cost per pound until you go over $6.82. Then go back a pound and multiply. 5 pounds times $1.19 equals $5.95.
Answer:
Step-by-step explanation:
Three days + 6 hours has 24*3 + 6 = 78 hours
You need only set up a proportion
5850 / 78 = x / 24 Multiply by 24
24 * 5850 / 68 = x
1800 watt hours / day
Answer:
- Define your variable and write your equation: 36 + b + (3b-28) = 180°.
- measure of the second angle: 43°.
- measure of the third angle: 101°
Step-by-step explanation:
a = 36
c = 3b - 28
a + b + c = 180°
a = measure of the first angle
b = measure of the second angle
c = measure of the third angle
then:
1) 36 + b + (3b-28) = 180 ⇒ )Define your variable. Write your equation and solve)
b + 3b + 36 - 28 = 180
4b + 8 = 180
4b = 180 - 8
4b = 172
b = 172/4
2) b = 43° ⇒ measure of the second angle
c = 3b - 28
c = 3*43 - 28
c = 129 - 28
3) c = 101° ⇒ measure of the third angle
Check:
36° + 43° + 101° = 180°